Belle Vue, Bankso: Completion May 2005

01/11/04: Construction reaches the third floor.
(Click the images below to enlarge)

A view of the front of the development upon completion. The development includes a secluded courtyard.
A view of the front of the development. A view from the third floor towards the mountains.
The final section of the roof is laid on the top floor. The terrace of the top floor with stunning views.
A close up of the building taken from the inner courtyard. A view from the second floor of the rear of the building looking over Bansko town.
A view of the rear of the building. A view along the rear side of the building which faces towards Bansko town.